Construction lenders decline far more deals for weak packages than for weak projects. A lender reviewing dozens of requests will move fastest on the one that answers its questions before it asks them. Here is what a complete package usually contains, and why each piece matters.
1. A budget a lender can trust
The budget is the foundation of the loan. Lenders want to see:
- Hard costs broken down by trade, ideally reflecting contractor bids rather than estimates.
- Soft costs: design, engineering, permits, legal, insurance, developer fee and financing costs.
- Contingency for both hard and soft costs, sized to the complexity of the project.
- Interest reserve large enough to carry the loan through construction and lease-up.
- Land at cost or at a supportable value, with a clear explanation of how it is treated in the equity calculation.
A budget that has been reviewed by a third-party cost consultant before you go to lenders gives everyone more confidence.
2. The right construction contract
Lenders strongly prefer a guaranteed maximum price (GMP) or fixed-price contract with an experienced, well-capitalized general contractor. They will look at the contractor's track record on similar projects, its financial strength, its bonding capacity and whether payment and performance bonds or subcontractor default insurance are in place.
Cost-plus contracts without a cap, or a first-time contractor on a complex build, make lenders cautious and usually mean lower leverage.
3. Equity, and where it comes from
Senior construction loans are commonly sized at a lower percentage of total cost than acquisition or bridge loans, so equity is central. Be ready to show:
- How much cash equity is already in the project and how much is still to come.
- The source of the remaining equity and evidence that it is available.
- The full capital stack, including any mezzanine or preferred equity.
Lenders typically require the sponsor's equity to go in before the first loan draw.
4. Entitlements, permits and site
- Zoning and entitlement approvals, or a credible and near-term path to them.
- Building permit status.
- Phase I environmental report and, where needed, a Phase II.
- Geotechnical report, survey and title.
- Utility availability, which is especially important for industrial, data center and large residential projects.
5. The market case
Lenders need to believe the finished project will lease or sell at the rents and prices in your pro forma. Support your assumptions with rent and sale comparables, a supply pipeline view and any pre-leasing or pre-sales. A third-party market study helps on larger projects.
6. The sponsor
Expect lenders to ask for a sponsor resume focused on comparable projects, a schedule of real estate owned, personal or entity financial statements and liquidity, and details of the guarantor. Completion and carry guarantees are common in construction lending, so the guarantor's net worth and liquidity matter.
7. The pro forma and exit
A clear development pro forma showing costs, timeline, stabilized income, projected value and the exit, whether that is a refinance into permanent or bridge debt or a sale. Lenders will stress-test it, so show sensitivity to higher costs, slower lease-up and higher exit cap rates.
Putting it together
A strong package does not guarantee approval; every lender applies its own criteria. But it gets your deal a serious read and makes it possible to compare lenders on the same basis. If you would like a second pair of eyes on your package before it goes out, submit the deal and our underwriting desk will review it.
Frequently asked questions
What documents do I need for a construction loan?
Typically a detailed hard and soft cost budget, the construction contract and contractor information, evidence of equity, entitlement and permit status, environmental, geotechnical, survey and title reports, market support for rents or sale prices, a development pro forma, and sponsor materials such as a resume, schedule of real estate owned and financial statements.
Why do lenders prefer a GMP contract?
A guaranteed maximum price contract caps what the general contractor can charge for the defined scope, which reduces the risk of cost overruns that the lender and sponsor would otherwise have to absorb.
When does sponsor equity go into a construction project?
Lenders typically require the sponsor's equity to be invested before the first loan draw, so the lender's money is the last in rather than the first.
What guarantees do construction lenders ask for?
Completion and carry guarantees are common. Some lenders also ask for partial repayment guarantees. The package is negotiated and depends on the lender, the project and the guarantor's net worth and liquidity.
This article is general information, not legal, tax or investment advice, and not an offer or commitment to lend. Eniji Lending is not a lender. Loan terms, leverage and pricing are indicative, vary by lender and change with market conditions; all financing is subject to lender underwriting.